TMOD - Navigation and Tracking Services

Year 2000 Compliance Plan

(draft)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Prepared by:

Clifforrd R. Kettemborough, Y2K Task Manager

Approved by:

 Edward J. Christensen, System Services Manager

 

 

January, 98

 

 

 

Jet Propulsion Laboratory


 

Concurrence Signature Page

 

 

 

 

Pieter Kallemeyn, System Services Development Engineer

 

 

 

 

 

 

 

 


 

Change Incorporation Log

 

 

 

 

 

Status

Pages Affected

Issue Date

      New

      All

      January, 98

     
     
     
     
     

 


 

 

 

 

Table of Contents

 

 

 

  1. Introduction
    1. Purpose
    2. Document Scope
    3. Background
    4. Summary of Approach
    5. Reference Materials
    6. Controlling Documents
    7. Applicable Documents

     

     

  2. TMOD Navigation and Tracking System services Year 2000 Compliance Requirements
    1. Sub-systems (components)
    2. Compliance Verification Methods
    3. General Integrity
      1. System Date
      2. Two-Digit Year Fields
      3. High-Risk Dates
      4. Time-outs, Delays, and Sleep Functions
      5. No Special Interpretation for Date Field Allowed
      6. Reinitialize Normally
      7. Correct Rollover of System dates
      8. Handle Non-compliant Input
      9. Dates on General Labels
      10. Dates on Hardcopy Reports
    4. Date Integrity
      1. Data Manipulation and Leap Year
      2. Dates from both Centuries
      3. Dates in Data Storage
      4. Date Conversion
      5. Overflow
      6. Dates within Playback data
      7. Pass-through Data
      8. Explicit Century
      9. Implicit Century
    5. Performance Requirements
    6. Reliability, Maintainability, and Related Requirements
    7. 3rd Party Software

     

     

  3. Implementation Plan
    1. Approach
      1. Constraints
      2. Organization, Roles, and Responsibilities
      3. Compliance
      4. Documentation Requirements
      5. Work Breakdown Structure
      6. Standards and Activities
      7. Process Support
      8. Engineering Methods, Tools, and Training
      9. Deliverables

     

     

  4. Acceptance Criteria and Qualification Methods
    1. Testing Approach
    2. Test Plan
    3. Test Procedures
    4. Test Cases
    5. Test Scripts
      1. Unit
      2. Integration
      3. System
      4. Regression
      5. Acceptance
    6. Verification and Validation
      1. Verification Methods
      2. Validation Methods
      3. Certification

     

     

  5. Schedule
    1. Priorities
    2. Resources

     

     

  6. Cost

 

 

 

 

Appendices

 

A. On Line Reference